Page 4 - TBIS_15194-2019_(EN)_3nd
P. 4
TBIS 15194 :2019
Annex A (informative) Example of recommendation for battery charging ····· 119
Annex B (informative) Example of relation between speed/torque/current ···· 120
Annex C (normative) Electromagnetic compatibility of EPAC and ESA ······· 123
C.1 Conditions applying to EPAC and to electrical/electronic sub-assemblies(ESA) 123
C.1.1 Marking ············································································· 123
C.1.2 Requirements ······································································ 123
C.2 Method of measuring broad-band electromagnetic radiation from EPAC 127
C.2.1 Measuring equipment ···························································· 127
C.2.2 Test method········································································· 127
C.2.3 Measurement ····································································· 128
C.3 Method of measuring narrow band electromagnetic radiation from EPAC 128
C.3.1 General ·············································································· 128
C.3.2 Antenna type, position and orientation. ······································ 128
C.4 Methods of testing EPAC immunity to electromagnetic radiation ·········· 128
C.4.1 General ·············································································· 128
C.4.2 Expression of results ····························································· 128
C.4.3 Test conditions ····································································· 128
C.4.4 State of the EPAC during the tests ··········································· 129
C.4.5 Type, position and orientation of the field generator ······················ 129
C.4.6 Requisite test and condition ···················································· 131
C.4.7 Generation of the requisite field strength ···································· 131
C.4.8 Inspection and monitoring equipment ······································· 133
C.5 Method of measuring broad-band electromagnetic radiation from separate
technical units (ESA) ······································································· 133
iv